Research Portal
Displaying 1 – 10 of 37 results
Geoscience » Georges Bank Research & Data
Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021
June – December 2021
Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.
The Vectron2 Project: Turbulence Measurements for the In-stream Tidal Energy Industry
March 2019 – November 2021
The Vectron is a new sensor used for measuring turbulence velocity within a tidal turbine’s swept area. The Vectron has been successfully prototyped, where next steps are to take the technology to the ‘industry-ready’ stage of development and the focus of this project.
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
The Pathway Program: Validating reliable environmental monitoring for ocean energy projects
April 2019 – October 2021
OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Environmental Monitoring System Development
November 2019 – April 2021
The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device
Performance validation of a remotely operated vehicle (ROV) in a controlled environment
June 2018 – October 2019
In the past few years, the Nova Scotia tidal community has augmented its marine operational capacity, but some unknowns and risks still exist and the cost associated with such operations are high.
Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments
October 2017 – October 2019
Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.
Multi-Scale Turbulence Measurement in the Aquatron Laboratory
July 2018 – July 2019
This project has two primary objectives - to characterize the flow and turbulence in the Aquatron facility pool tank using turbulence sensors calibrated against a traceable standard; and to test technologies for investigating the horizontal variability of turbulence in real-world tidal channels.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Shelburne Sub-Basin Play Fairway Analysis Update
November 2018 – June 2019
Shortly after the Scotian Shelf and Slope Play Fairway Analysis (PFA) was released in 2011, Shell Canada acquired six exploration parcels in the Shelburne Subbasin and collected approximately 10,850 square kilometers of wide azimuth 3D seismic data.