Research Portal
Displaying 11 – 20 of 21 results
Use of Fish Tracking Data to Model Striped Bass Turbine Encounter Probability in Minas Passage
September 2016
This project used fish tracking datasets and VEMCO detection-range tests to calculate fish-turbine encounter probabilities for striped bass.
Spectral and Structure Function Estimates of Turbulence Dissipation Rates in a High Flow Tidal Channel Using Broadband ADCPs
January 2016
Spectral and structure function methods are implemented to compute the dissipation rate, ε, from broadband, diverging-beam, acoustic Doppler current profiler (ADCP) data collected at four sites in a high-flow tidal channel.
Turbulence and Bottom Stress in Minas Passage and Grand Passage
September 2011 – February 2015
This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.
Investigation of the Vertical Distribution, Movement and Abundance of Fish in the Vicinity of Proposed Tidal Power Energy Conversion Devices
March 2010 – December 2014
This project studied active fish avoidance of a turbine using the Coda Octopus Echoscope II 3-D multi-beam sonar mounted on a bottom platform. The objective was to observe and quantify the distribution and abundance of fish in the water column and their ability to detect and avoid turbines.
Atlantic Sturgeon Spatial and Temporal Distribution in Minas Passage, Nova Scotia, Canada, a Region of Future Tidal Energy Extraction
January 2010 – January 2014
In the Bay of Fundy, Atlantic sturgeon from endangered and threatened populations in the USA and Canada migrate through Minas Passage to enter and leave Minas Basin.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Acoustic Tracking of Fish Movements in the Minas Passage and FORCE Crown Lease Area: Pre-Turbine Baseline Studies
June 2011 – July 2013
This project used animal tracking technology developed by VEMCO, a division of AMIRIX Systems of Halifax, NS. The technology allows researchers to track animal movements and behaviour over a scale of kilometers.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.
Assessing the Far Field Effects of Tidal Power Extraction on the Bay of Fundy, Gulf of Maine and Scotian Shelf
January 2010 – April 2012
The Bay of Fundy and Gulf of Maine system has a natural resonant period very close to the main semi-diurnal lunar tide. This results in the world’s highest tides and strong tidal currents in the Bay of Fundy, particularly in the Minas Channel and Minas Basin.
Assessment of Hydrodynamic Impacts throughout the Bay of Fundy and Gulf of Maine due to Tidal Energy Extraction by Tidal Lagoons
January 2010 – December 2011
The researchers extended existing hydrodynamic models of tidal flows in the Bay of Fundy to simulate the presence and operation of a tidal lagoon project located in the Minas Basin.