Research Portal
Displaying 11 – 19 of 19 results
Geoscience » Source Rock & Depositional Environment
Aspy Well Geochemistry
December 2019 – September 2020
This project determines if indications of migrated hydrocarbons or potential source rocks were encountered during the 2018 drilling of BP’s deep-water well Aspy D-11 well.
Testing of 360-Degree Imaging Technologies for Improved Animal Detection around Tidal Energy Installations
May 2019 – February 2020
The research goal was to conduct a field study to test the performance of a new imaging camera system mounted on a floating tidal platform deployed in Grand Passage, Bay of Fundy. Field testing featured testing of different camera mount locations on the platform in order to optimize field-of-vie
Geoscience » Source Rock & Depositional Environment
Seismic Reconstruction and Petroleum Systems Modeling of the Nova Scotia-Morocco Conjugate Margin
April – December 2019
Seismic Reconstruction
The Seismic Reconstruction project is a stand-alone element of the Conjugate Margin Program undertaken by the consulting firm Beicip Franlab. A number of subprojects and data streams are inputs to this project.
Multipurpose X-Band Marine Radar Network for the Minas Passage
January – November 2019
Marine X-band radar locates vessels and features, including coastlines and buoys. It filters distracting signals (eg.
Geoscience » Georges Bank Research & Data
Georges Bank Research & Data
January 2019
Georges Bank is a large submarine bank (250km by 150km – 40,000 km2) located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia.
Turbulence and Bottom Stress in Minas Passage and Grand Passage
September 2011 – February 2015
This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Acoustic Tracking of Fish Movements in the Minas Passage and FORCE Crown Lease Area: Pre-Turbine Baseline Studies
June 2011 – July 2013
This project used animal tracking technology developed by VEMCO, a division of AMIRIX Systems of Halifax, NS. The technology allows researchers to track animal movements and behaviour over a scale of kilometers.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.