Research Portal
Displaying 11 – 20 of 20 results
Real-Time Detection of Marine Mammals in High Flow Environments
May 2019 – September 2021
The project research goal is to design and test an innovative acoustic sensor system that will feature a wireless magneto-inductive (MI) communications link – to alert users in real time of the presence and location of marine mammals in high noise tidal environments. The research entails a field
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
The Pathway Program: Validating reliable environmental monitoring for ocean energy projects
April 2019 – October 2021
OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i
Geoscience » Source Rock & Depositional Environment
Analysis of Palaeoenvironment, Palaeoclimate and Palaeooceanographic Models to Predict Distribution of Source Rocks Offshore Nova Scotia (part of the PAGEO research program)
November 2020 – June 2021
The objective of this work is to predict the distribution of Tithonian and early Jurassic (Toarcian, Pliensbachian, Sinemurian, Hettangian) source rocks based on biogeographic principles derived from modern environments, and palaeoenvironmental interpretations derived from palaeogeographic mappin
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
Environmental Monitoring System Development
November 2019 – April 2021
The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device
Geoscience » Source Rock & Depositional Environment
Seismic Reconstruction and Petroleum Systems Modeling of the Nova Scotia-Morocco Conjugate Margin
April – December 2019
Seismic Reconstruction
The Seismic Reconstruction project is a stand-alone element of the Conjugate Margin Program undertaken by the consulting firm Beicip Franlab. A number of subprojects and data streams are inputs to this project.
Multipurpose X-Band Marine Radar Network for the Minas Passage
January – November 2019
Marine X-band radar locates vessels and features, including coastlines and buoys. It filters distracting signals (eg.
Geoscience » Georges Bank Research & Data
Georges Bank Research & Data
January 2019
Georges Bank is a large submarine bank (250km by 150km – 40,000 km2) located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia.