Research Portal
Displaying 11 – 20 of 35 results
Valuation Method for Electric Ancillary Services
May – September 2020
The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).
Analysis Framework for Long-Term and Cumulative Effects Monitoring
October 2018 – September 2020
This project created a framework for testing in-stream tidal turbine effects on specific marine species populations. The framework provides the basis for future assessment of far-field and cumulative environmental effects.
Modeling of Electric Boats as Energy Storage
July 2018 – September 2020
Electric boats have the potential to act as “energy storage wrapped in a boat”.
Geoscience » Source Rock & Depositional Environment
Predictive Modeling of Sandstone Reservoir Distribution in the SW Scotian Basin
March 2018 – April 2020
The SW Scotian Basin is considered an under-explored passive margin sedimentary basin, however, it is also the most probable location to find oil on the Scotian Margin.
Reducing Costs of Tidal Energy through a Comprehensive Characterization of Turbulence in Minas Passage
October 2017 – March 2020
Turbulence is a significant issue at every site being considered for in-stream tidal energy development.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Greater North Atlantic Liassic Petroleum Systems Synthesis
October 2019 – February 2020
In the absence of definitive, direct evidence for a Liassic (i.e. Lower Jurassic) petroleum system offshore Nova Scotia, information is required on source rock analogs around the greater North Atlantic region.
Geoscience » Source Rock & Depositional Environment
Piston Coring Geochemistry Program
January 2015 – January 2020
Confirming the presence of hydrocarbons from an oil-prone Jurassic age source rock would encourage exploration in the deep water portion of Nova Scotia’s offshore.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Laurentian Sub-Basin Atlas (2014)
January – December 2014
This project assesses the petroleum system of the Laurentian sub-basin bidding block and surrounding areas.
Tidal Energy: Strategic Environmental Assessment for the Cape Breton Coastal Region and Bras d’Or Lakes (Phase I) – Community Response Report
January 2014
This report describes and summarizes the outcomes of a stakeholder and community engagement program implemented as the second stage of the Strategic Environmental Assessment (SEA) on Marine Renewable Energy (MRE) for the Cape Breton Coastal Region and the Bras d'Or Lakes. It follows and compleme
Tidal Energy: Strategic Environmental Assessment – Bay of Fundy Update (Phase II)
January 2014
This is an update to the Phase 1 Strategic Environmental Assessment (SEA) of marine renewable energy in the Bay of Fundy, with an emphasis on tidal in‐stream turbines.