Research Portal
Displaying 21 – 25 of 25 results
Mi’kmaq Ecological Knowledge Study (Phase 2)
May 2012
A second Mi’kmaq Ecological Knowledge Study was carried out prior to potential marine renewable energy development in the Brier and Long islands area of the Bay of Fundy, including Grand Passage and Petite Passage.
Scoping Study on Socio-Economic Impacts of Tidal Energy Development in Nova Scotia: A Research Synthesis & Priorities for Future Action
November 2011 – January 2012
This scoping study highlights many socio-economic issues related to in-stream tidal energy development and discusses best practices, case studies and tools developed to facilitate positive socio-economic benefits and community development.
3-D Acoustic Tracking of Fish, Sediment-Laden Ice and Large Wood Debris in the Minas Passage of the Bay of Fundy
October 2009 – December 2011
Researchers used VEMCO animal tracking technology to complete in-situ testing of the path, depth and velocity of fish and objects passing through the Minas Passage.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Play Fairway Analysis Atlas
January 2011
The original Play Fairway Analysis completed in 2011 identified rich hydrocarbon potential offshore Nova Scotia, with unrisked 120TCF of gas and 8Bbbls of oil in place. This potential has diverse characteristics and scales, which are described in detail in the Atlas.
Mi’kmaq Ecological Knowledge Study (Phase 1)
August 2009
A Mi’kmaq Ecological Knowledge Study (MEKS) was conducted by Membertou Geomatics Consultants on the Minas Channel area of the Bay of Fundy. This is a comprehensive body of knowledge documenting the collective ecological knowledge held by the Mi’kmaq people.