Research Portal
Displaying 21 – 30 of 33 results
Drones and Drifters – The Great Pumpkin Race
October 2016 – July 2017
This project tested and developed a new low-cost approach to collecting oceanographic measurements for use in tidal initial site assessments. The plan combines one of the oldest tools in oceanography, the drifter, with one of the newest, the drone.
FORCE Data Management System/User Interface
April – June 2017
This project defined a Data Management System (DMS) and user interface solution for use by FORCE.
Impact of Channel Blockage on the Performance of Axial and Cross-Flow Hydrokinetic Turbines
April 2017
This work investigates the effect of channel blockage on how axial and cross-flow turbines perform. The objective is to fill a gap in the literature on suitable blockage corrections for cross-flow turbines.
Advancing Tidal Energy Turbine Operations through High Fidelity Tug Propulsion and Control Simulation Software
November 2016 – March 2017
The project objective was to develop a numerical model of a tug boat and its propulsion system to accurately predict its dynamic behaviour in turbulent tidal flows.
Environmental Effects Monitoring Project
January 2016 – January 2017
FORCE developed an Environmental Effects Monitoring Program (EEMP) to study five major subject areas: fish, marine mammals, lobster, marine noise and seabirds. The EEMP was designed to be adaptive in nature.
High-Resolution Numerical Model Resource Assessment of Minas Passage, Bay of Fundy
January 2017
Two numerical models developed by the Acadia Tidal Energy Institute are described. The models simulate the tidal flow in the Bay of Fundy, and in particular the Minas Passage. The models have different grid resolution, one suitable for site assessment and one suitable for resource assessment.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.
Tidal Energy Resource Assessment Map for Nova Scotia
March – October 2012
This project used numerical simulations and theoretical calculations to predict not only the power that can be extracted from the flow through a passage but also the reduction in flow through the passage.