Research Portal
Displaying 21 – 28 of 28 results
Real-Time, Targeted Imaging of Turbine-Marine Life Interactions
March 2017 – February 2019
The research goal is to redesign and validate a dynamic mount to improve targeted real-time imaging of marine life in the near-field zone of a tidal turbine. The adjustable mount will enable imaging sensors to be aimed directly facing the tidal turbine.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Laurentian Sub-Basin Atlas (2014)
January – December 2014
This project assesses the petroleum system of the Laurentian sub-basin bidding block and surrounding areas.
Investigation of the Vertical Distribution, Movement and Abundance of Fish in the Vicinity of Proposed Tidal Power Energy Conversion Devices
March 2010 – December 2014
This project studied active fish avoidance of a turbine using the Coda Octopus Echoscope II 3-D multi-beam sonar mounted on a bottom platform. The objective was to observe and quantify the distribution and abundance of fish in the water column and their ability to detect and avoid turbines.
Atlantic Sturgeon Spatial and Temporal Distribution in Minas Passage, Nova Scotia, Canada, a Region of Future Tidal Energy Extraction
January 2010 – January 2014
In the Bay of Fundy, Atlantic sturgeon from endangered and threatened populations in the USA and Canada migrate through Minas Passage to enter and leave Minas Basin.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Acoustic Tracking of Fish Movements in the Minas Passage and FORCE Crown Lease Area: Pre-Turbine Baseline Studies
June 2011 – July 2013
This project used animal tracking technology developed by VEMCO, a division of AMIRIX Systems of Halifax, NS. The technology allows researchers to track animal movements and behaviour over a scale of kilometers.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.