Research Portal
Displaying 21 – 28 of 28 results
Quantifying Demographics and Monitoring Movement of American Lobster in the Minas Passage and Basin
October 2017 – March 2019
The project consists of lobster fishing in Minas Passage during the fall lobster season to collect, assess and tag lobsters in this area, then fishing in Minas Basin from April to May to assess the spawning characteristics of lobster tagged the previous fall, then returning to Minas Passage to fi
Turbine Wake Characterization
November 2017 – March 2019
Turbine wake characterization is a key endeavour to the development of in-stream tidal turbine arrays. In a sense, a turbine’s footprint includes its wake, wherein flow speeds are less and turbulence is elevated compared to the ambient surroundings. It is thus desired to not just delineate wake
Real-Time, Targeted Imaging of Turbine-Marine Life Interactions
March 2017 – February 2019
The research goal is to redesign and validate a dynamic mount to improve targeted real-time imaging of marine life in the near-field zone of a tidal turbine. The adjustable mount will enable imaging sensors to be aimed directly facing the tidal turbine.
Geoscience » Seismic & Marine Sound
Test Snow Crab Response to Seismic Stress
February 2012 – September 2013
There is concern in Atlantic Canada that there is insufficient information on the potential effects of seismic noise on snow crab.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Acoustic Tracking of Fish Movements in the Minas Passage and FORCE Crown Lease Area: Pre-Turbine Baseline Studies
June 2011 – July 2013
This project used animal tracking technology developed by VEMCO, a division of AMIRIX Systems of Halifax, NS. The technology allows researchers to track animal movements and behaviour over a scale of kilometers.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.