Research Portal
Displaying 1 – 9 of 9 results
Geoscience » Georges Bank Research & Data
Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021
June – December 2021
Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Acceleration/Particle Velocity (PA/PV) Measurement System Evaluation in a Tidal Environment
February 2017 – December 2018
The objective of this project was designing and running a field experiment to test the performance of the Particle Acceleration/Particle Velocity (PA/PV) vector sensor.
Assessing Corrosion, Wear, Fatigue and VIV on Moorings and Cabling to Reduce Risk in Marine Operations
October 2017 – August 2018
The cost of cabling and moorings over the entire life of a tidal energy project is a significant proportion of total project expenditures and the potential failure of these components remains a major risk for the emerging tidal energy sector.
Geoscience » Spill Preparedness
Advanced Coastal Mapping to Support Hydrodynamic Modelling
April 2016 – June 2018
Nova Scotia’s Atlantic coast exhibits a variety of shorelines that may be vulnerable to contamination in the event of an offshore oil spill. In turn, variable currents, changing water levels, shoals, and exposed seaside conditions make effective spill response difficult for tidal inlets.
FORCE Data Management System/User Interface
April – June 2017
This project defined a Data Management System (DMS) and user interface solution for use by FORCE.
Impact of Channel Blockage on the Performance of Axial and Cross-Flow Hydrokinetic Turbines
April 2017
This work investigates the effect of channel blockage on how axial and cross-flow turbines perform. The objective is to fill a gap in the literature on suitable blockage corrections for cross-flow turbines.
Advancing Tidal Energy Turbine Operations through High Fidelity Tug Propulsion and Control Simulation Software
November 2016 – March 2017
The project objective was to develop a numerical model of a tug boat and its propulsion system to accurately predict its dynamic behaviour in turbulent tidal flows.