Valuation Method for Electric Ancillary Services
May – September 2020
The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).
Going with the Flow: Advancement of Drifting Platforms for use in Tidal Energy Site Assessment & Environmental Monitoring
April 2015 – August 2017
This research project aimed to apply a simple and low cost philosophy to ocean observation by developing an inexpensive low-profile surface drifter for use in initial assessment of potential tidal energy development opportunities. The project addressed limitations in the existing drifter design
Numerical Modeling of Tidal Turbine Behaviour under Real Turbulent Tidal Flow Conditions
December 2015 – December 2016
Researchers investigated and numerically quantified the behaviour of a tidal turbine under turbulent unsteady tidal flow, using flow data collected in the lower Bay of Fundy (Digby area).
Characterizing Tidal Flows and Turbine Power Production in Petit Passage using Oceanographic and CFD Models
September 2015 – March 2016
The goal of this project was to identify potential turbine deployment locations in Petit Passage Nova Scotia, using computational fluid dynamics (CFD) and finite volume coastal ocean models (FVCOM).
Turbulent Scale and Wake Modeling on a Horizontal Axis Turbine
January – April 2015
This project aimed to accurately simulate turbulent flow over a scaled horizontal axis tidal turbine to resolve turbulence in the near and far field regions.
Turbulence and Bottom Stress in Minas Passage and Grand Passage
September 2011 – February 2015
This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.
Tidal Energy Resource Assessment Map for Nova Scotia
March – October 2012
This project used numerical simulations and theoretical calculations to predict not only the power that can be extracted from the flow through a passage but also the reduction in flow through the passage.
A Framework for Environmental Risk Assessment and Decision-Making for Tidal Energy Development in Canada
March – May 2012
There is still a high degree of uncertainty regarding the environmental implications of in-stream tidal energy initiatives. This report outlines a science-based environmental risk assessment and decision-making framework for the emergent in-stream tidal energy industry.