Research Portal

Displaying 1 – 4 of 4 results

Filters

Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments

October 2017 – October 2019

Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.

Geoscience » Seismic & Marine Sound

Physics of the Interaction between a Crab and a Seismic Test Pulse – Development of a Mathematical Model and Testing of Model via Simulation

June 2009 – September 2011

Experimental attempts to establish whether seismic testing has any impact on crabs and the crab fishery have been hampered by a lack of theoretical work on the subject.