Research Portal
Displaying 1 – 10 of 12 results
The Vectron2 Project: Turbulence Measurements for the In-stream Tidal Energy Industry
March 2019 – November 2021
The Vectron is a new sensor used for measuring turbulence velocity within a tidal turbine’s swept area. The Vectron has been successfully prototyped, where next steps are to take the technology to the ‘industry-ready’ stage of development and the focus of this project.
Real-Time Detection of Marine Mammals in High Flow Environments
May 2019 – September 2021
The project research goal is to design and test an innovative acoustic sensor system that will feature a wireless magneto-inductive (MI) communications link – to alert users in real time of the presence and location of marine mammals in high noise tidal environments. The research entails a field
The Pathway Program: Validating reliable environmental monitoring for ocean energy projects
April 2019 – October 2021
OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i
Environmental Monitoring System Development
November 2019 – April 2021
The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device
Multipurpose X-Band Marine Radar Network for the Minas Passage
January – November 2019
Marine X-band radar locates vessels and features, including coastlines and buoys. It filters distracting signals (eg.
Integrated Active and Passive Acoustic System for Environmental Monitoring (ISEM)
August 2015 – May 2019
The project team will develop a novel environmental monitoring system that integrates data analysis software and active and passive acoustic sensors to provide real-time tracking of fish and marine mammals in high energy sites.
Geoscience » Georges Bank Research & Data
Georges Bank Research & Data
January 2019
Georges Bank is a large submarine bank (250km by 150km – 40,000 km2) located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia.
Going with the Flow: Advancement of Drifting Platforms for use in Tidal Energy Site Assessment & Environmental Monitoring
April 2015 – August 2017
This research project aimed to apply a simple and low cost philosophy to ocean observation by developing an inexpensive low-profile surface drifter for use in initial assessment of potential tidal energy development opportunities. The project addressed limitations in the existing drifter design
Assessing the Far Field Effects of Tidal Power Extraction on the Bay of Fundy, Gulf of Maine and Scotian Shelf
January 2010 – April 2012
The Bay of Fundy and Gulf of Maine system has a natural resonant period very close to the main semi-diurnal lunar tide. This results in the world’s highest tides and strong tidal currents in the Bay of Fundy, particularly in the Minas Channel and Minas Basin.
Assessment of Hydrodynamic Impacts throughout the Bay of Fundy and Gulf of Maine due to Tidal Energy Extraction by Tidal Lagoons
January 2010 – December 2011
The researchers extended existing hydrodynamic models of tidal flows in the Bay of Fundy to simulate the presence and operation of a tidal lagoon project located in the Minas Basin.