Research Portal
Displaying 1 – 10 of 28 results
Geoscience » Georges Bank Research & Data
Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021
June – December 2021
Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Integrating Hydro-acoustic Approaches to Predict Fish Interactions with In-Stream Tidal Turbines
October 2017 – December 2019
Understanding exactly how fish interact with tidal turbines is still a critical knowledge gap for the tidal energy sector.
Quantifying Fish-Turbine Interactions Using New VEMCO Tagging Technology
October 2017 – December 2019
This project tested innovative acoustic fish tagging technology made by VEMCO, a Nova Scotian engineering technology company. Their acoustic telemetry tags are expected to be more effective in noisy, high-current environments like the Minas Passage.
Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments
October 2017 – October 2019
Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.
Integrated Active and Passive Acoustic System for Environmental Monitoring (ISEM)
August 2015 – May 2019
The project team will develop a novel environmental monitoring system that integrates data analysis software and active and passive acoustic sensors to provide real-time tracking of fish and marine mammals in high energy sites.
Application of (Low-Cost) Drifters with Suspended Hydrophone Arrays to Assess Harbour Porpoise Use of the Water Column and Spatial Overlap with MRE Devices in the Minas Passage
October 2017 – April 2019
The project investigated the use of a new low-cost drifter technology to monitor the activity and depth distribution of harbour porpoises frequenting the Minas Passage and Minas Channel.
Turbine Wake Characterization
November 2017 – March 2019
Turbine wake characterization is a key endeavour to the development of in-stream tidal turbine arrays. In a sense, a turbine’s footprint includes its wake, wherein flow speeds are less and turbulence is elevated compared to the ambient surroundings. It is thus desired to not just delineate wake