Advancements in technologies and techniques for tidal energy development 

April 2017 – March 2020

This project was funded under the Natural Resources Canada Energy Innovation Program and supported research into innovative technologies and techniques to advance the tidal energy sector.  The research was comprised of five unique research initiatives with focus areas in environmental mo

Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments

October 2017 – October 2019

Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.

Performance validation of a remotely operated vehicle (ROV) in a controlled environment

June 2018 – October 2019

In the past few years, the Nova Scotia tidal community has augmented its marine operational capacity, but some unknowns and risks still exist and the cost associated with such operations are high.

Testing of a New Turbine Blade Design and Blade Materials

July 2018 – May 2019

There’s not yet a standardized, optimal way of extracting power from tidal currents. That’s why many tidal industry technologies are currently being tested around the world.

Acceleration/Particle Velocity (PA/PV) Measurement System Evaluation in a Tidal Environment

February 2017 – December 2018

The objective of this project was designing and running a field experiment to test the performance of the Particle Acceleration/Particle Velocity (PA/PV) vector sensor.

Analysis of Tidal Turbine Mooring Systems in Turbulent Flows Applying the (Wind Industry) FAST Simulation Tool and DSA ProteusDS Software

March – September 2018

For floating tidal turbine platforms, the turbine forces and resulting platform motions have a direct impact on the lifetime of its moorings and cables. This means the tidal sector must predict accurate tidal turbine loading on floating platforms to determine mooring life and cable longevity.

Assessing Corrosion, Wear, Fatigue and VIV on Moorings and Cabling to Reduce Risk in Marine Operations

October 2017 – August 2018

The cost of cabling and moorings over the entire life of a tidal energy project is a significant proportion of total project expenditures and the potential failure of these components remains a major risk for the emerging tidal energy sector.

Tidal Energy: Strategic Environmental Assessment – Bay of Fundy (Phase I)

April 2018

This Strategic Environmental Assessment (SEA) provides advice on whether, when and under what conditions tidal energy demonstration and commercial projects should be allowed in the Bay of Fundy.

FORCE Data Management System/User Interface

April – June 2017

This project defined a Data Management System (DMS) and user interface solution for use by FORCE.

Impact of Channel Blockage on the Performance of Axial and Cross-Flow Hydrokinetic Turbines

April 2017

This work investigates the effect of channel blockage on how axial and cross-flow turbines perform. The objective is to fill a gap in the literature on suitable blockage corrections for cross-flow turbines.