Research Portal

Displaying 1 – 3 of 3 results

Filters

Review of Nova Scotia Power Transmission System Interconnection Requirements

April – May 2021

Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo

Geoscience » Play Fairway Analyses Atlases 2010–Present

Laurentian Sub-Basin Atlas (2014)

January – December 2014

This project assesses the petroleum system of the Laurentian sub-basin bidding block and surrounding areas.

Tidal Energy: Strategic Environmental Assessment – Bay of Fundy Update (Phase II)

January 2014

This is an update to the Phase 1 Strategic Environmental Assessment (SEA) of marine renewable energy in the Bay of Fundy, with an emphasis on tidal in‐stream turbines.