Research Portal
Displaying 1 – 8 of 8 results
Geoscience » Play Fairway Analyses Atlases 2010–Present
Greater North Atlantic Liassic Petroleum Systems Synthesis
October 2019 – February 2020
In the absence of definitive, direct evidence for a Liassic (i.e. Lower Jurassic) petroleum system offshore Nova Scotia, information is required on source rock analogs around the greater North Atlantic region.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Shelburne Sub-Basin Play Fairway Analysis Update
November 2018 – June 2019
Shortly after the Scotian Shelf and Slope Play Fairway Analysis (PFA) was released in 2011, Shell Canada acquired six exploration parcels in the Shelburne Subbasin and collected approximately 10,850 square kilometers of wide azimuth 3D seismic data.
Tidal Energy: Strategic Environmental Assessment – Bay of Fundy (Phase I)
April 2018
This Strategic Environmental Assessment (SEA) provides advice on whether, when and under what conditions tidal energy demonstration and commercial projects should be allowed in the Bay of Fundy.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Sydney Basin Play Fairway Analysis Atlas (2017)
July 2017
The objectives of this Play Fairway Analysis are to build a detailed and comprehensive understanding of the petroleum systems of the Sydney Basin and provide a resource evaluation based on the petroleum systems assessment. The study concludes there is an effective petroleum system charged by mai
Marine Renewable Energy: Background Report To Support a Strategic Environmental Assessment (SEA) for the Cape Breton Coastal Region, inclusive of the Bras D’Or Lakes
June – December 2012
In 2011 following a competitive request for proposal process, OERA commissioned AECOM’s Halifax office to undertake a Strategic Environmental Assessment (SEA) for marine renewable energy in Cape Breton.
Impacts of Tidal Energy Extraction on Sediment Dynamics in Minas Basin, Bay of Fundy
February 2010 – December 2012
Researchers developed a numerical hydrodynamic and sediment transport model for Minas Basin in the Bay of Fundy, focusing on the sediment dynamics of the tidal inlets and flats.
Cape Breton Tidal Energy Resource Assessment
November 2011 – October 2012
In support of the Strategic Environmental Assessment (SEA) for the Cape Breton Region, inclusive of the Bras d’Or Lakes, Acoustic Doppler Current Profiler (ADCP) units were deployed at Barra Strait, Seal Island Bridge and Carey Point to collect tidal flow information. Potential sites for tidal e
Effects of Energy Extraction on Sediment Dynamics in Intertidal Ecosystems of the Minas Basin
January 2010 – May 2012
This project assessed how the dynamics of sedimentation change when energy is extracted from a macro-tidal system. The differences in tidal prism and energy between neap and spring tidal cycles were used as a proxy for energy extraction by in-stream tidal power devices.