Research Portal
Displaying 1 – 8 of 8 results
Geoscience » Scotian Basin Integration Atlas 2023
Scotian Basin Integration Atlas 2023
January 2022 – August 2023
The Scotian Basin Integration Atlas 2023 represents a collaborative and comprehensive new play fairway analysis of the deep water sub-basins, offshore Nova Scotia.
Multi-Scale Turbulence Measurement in the Aquatron Laboratory
July 2018 – July 2019
This project has two primary objectives - to characterize the flow and turbulence in the Aquatron facility pool tank using turbulence sensors calibrated against a traceable standard; and to test technologies for investigating the horizontal variability of turbulence in real-world tidal channels.
Remote Acoustic Measurements of Turbulence in High-Flow Tidal Channels during High Wave Conditions
April 2018 – April 2019
Many of the high-flow tidal channels targeted for worldwide in-stream hydro-electric development are impacted by surface gravity waves incident from a large exterior basin (e.g. the Bay of Fundy/Gulf of Maine/North Atlantic).
Turbine Wake Characterization
November 2017 – March 2019
Turbine wake characterization is a key endeavour to the development of in-stream tidal turbine arrays. In a sense, a turbine’s footprint includes its wake, wherein flow speeds are less and turbulence is elevated compared to the ambient surroundings. It is thus desired to not just delineate wake
Going with the Flow II: Using Drifters to Address Uncertainties in the Spatial Variation of Tidal Flows
October 2017 – June 2018
Drifters are one of the oldest, simplest and most reliable methods for measuring ocean currents. Drifters also provide a simple, low risk platform from which to gather acoustic information along flow streamlines or ‘drift tracks’.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage
October 2011 – January 2013
This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.