Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

The Pathway Program: Validating reliable environmental monitoring for ocean energy projects

April 2019 – October 2021

OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i

Environmental Monitoring System Development

November 2019 – April 2021

The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device

Acceleration/Particle Velocity (PA/PV) Measurement System Evaluation in a Tidal Environment

February 2017 – December 2018

The objective of this project was designing and running a field experiment to test the performance of the Particle Acceleration/Particle Velocity (PA/PV) vector sensor.

Analysis of Tidal Turbine Mooring Systems in Turbulent Flows Applying the (Wind Industry) FAST Simulation Tool and DSA ProteusDS Software

March – September 2018

For floating tidal turbine platforms, the turbine forces and resulting platform motions have a direct impact on the lifetime of its moorings and cables. This means the tidal sector must predict accurate tidal turbine loading on floating platforms to determine mooring life and cable longevity.

Assessing Corrosion, Wear, Fatigue and VIV on Moorings and Cabling to Reduce Risk in Marine Operations

October 2017 – August 2018

The cost of cabling and moorings over the entire life of a tidal energy project is a significant proportion of total project expenditures and the potential failure of these components remains a major risk for the emerging tidal energy sector.

Tidal Energy: Strategic Environmental Assessment – Bay of Fundy (Phase I)

April 2018

This Strategic Environmental Assessment (SEA) provides advice on whether, when and under what conditions tidal energy demonstration and commercial projects should be allowed in the Bay of Fundy.

Nova Scotia Small Tidal Test Centre: Gap Analysis and Business Case

November 2017 – March 2018

As the tidal energy industry develops, there is increasing interest in the prospects for small-scale tidal energy development. Building small-scale tidal energy installations has promise given the number of locations where they can be used.

In Situ Turbulence Replication and Measurement (InSTREAM)

October 2015 – January 2018

The In Situ Turbulence Replication and Measurement (InSTREAM) project was conceived to address some fundamental questions about the turbulence physics in tidal energy sites and laboratory tanks used to simulate these sites.