Research Portal
Displaying 1 – 3 of 3 results
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
Geoscience » Play Fairway Analyses Atlases 2010–Present
Laurentian Sub-Basin Atlas (2014)
January – December 2014
This project assesses the petroleum system of the Laurentian sub-basin bidding block and surrounding areas.
Tidal Energy: Strategic Environmental Assessment – Bay of Fundy Update (Phase II)
January 2014
This is an update to the Phase 1 Strategic Environmental Assessment (SEA) of marine renewable energy in the Bay of Fundy, with an emphasis on tidal in‐stream turbines.