Research Portal

Displaying 1 – 10 of 30 results

Filters

Geoscience » Georges Bank Research & Data

Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021

June – December 2021

Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.

Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

The Pathway Program: Validating reliable environmental monitoring for ocean energy projects

April 2019 – October 2021

OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i

Review of Nova Scotia Power Transmission System Interconnection Requirements

April – May 2021

Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo

Environmental Monitoring System Development

November 2019 – April 2021

The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device

Performance validation of a remotely operated vehicle (ROV) in a controlled environment

June 2018 – October 2019

In the past few years, the Nova Scotia tidal community has augmented its marine operational capacity, but some unknowns and risks still exist and the cost associated with such operations are high.

Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments

October 2017 – October 2019

Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.

Testing of a New Turbine Blade Design and Blade Materials

July 2018 – May 2019

There’s not yet a standardized, optimal way of extracting power from tidal currents. That’s why many tidal industry technologies are currently being tested around the world.

Optimized Combinations of Tidal, Wind and Solar Electricity Generation with Energy Storage to Meet Nova Scotia’s Electrical Demand

August 2018 – March 2019

Wind, solar and tidal-generated electricity each have different, but potentially complimentary, cyclic times.