Geoscience » Georges Bank Research & Data

Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021

June – December 2021

Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.

Real-Time Detection of Marine Mammals in High Flow Environments

May 2019 – September 2021

The project research goal is to design and test an innovative acoustic sensor system that will feature a wireless magneto-inductive (MI) communications link – to alert users in real time of the presence and location of marine mammals in high noise tidal environments.  The research entails a field

Review of Nova Scotia Power Transmission System Interconnection Requirements

April – May 2021

Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo

Development of Acoustic Doppler Aquatic Animal Monitoring (ADAAM) for application to marine life movement in high-energy tidal channels

March 2018 – February 2021

Acoustic Doppler Current Profilers (ADCPs) are a standard tool used for measuring ocean currents.

Funding and Financial Supports for Tidal Energy Development in Nova Scotia

June – September 2016

To help ensure Nova Scotia and Canada benefit from a sustainable marine renewable energy industry over the longer term, this study identifies the suite of applicable funding and financial support mechanisms used in different jurisdictions around the world, recommends a combination that may be sui

Use of Fish Tracking Data to Model Striped Bass Turbine Encounter Probability in Minas Passage

September 2016

This project used fish tracking datasets and VEMCO detection-range tests to calculate fish-turbine encounter probabilities for striped bass.

MRE Infrastructure Assessment Update

May – August 2016

This project reviewed the results of a 2011 study to identify where significant changes in infrastructure demands have occurred.