Research Portal

Displaying 11 – 20 of 63 results

Filters

Data Analysis Component of Comparative Passive Acoustic Monitoring (PAM) technology assessment

November 2019 – June 2020

The Pathway Program - Technology Validation: Passive Acoustic Monitoring Device

Advancements in technologies and techniques for tidal energy development 

April 2017 – March 2020

This project was funded under the Natural Resources Canada Energy Innovation Program and supported research into innovative technologies and techniques to advance the tidal energy sector.  The research was comprised of five unique research initiatives with focus areas in environmental mo

Testing of 360-Degree Imaging Technologies for Improved Animal Detection around Tidal Energy Installations

May 2019 – February 2020

The research goal was to conduct a field study to test the performance of a new imaging camera system mounted on a floating tidal platform deployed in Grand Passage, Bay of Fundy.  Field testing featured testing of different camera mount locations on the platform in order to optimize field-of-vie

Integrating Hydro-acoustic Approaches to Predict Fish Interactions with In-Stream Tidal Turbines

October 2017 – December 2019

Understanding exactly how fish interact with tidal turbines is still a critical knowledge gap for the tidal energy sector.

Quantifying Fish-Turbine Interactions Using New VEMCO Tagging Technology

October 2017 – December 2019

This project tested innovative acoustic fish tagging technology made by VEMCO, a Nova Scotian engineering technology company. Their acoustic telemetry tags are expected to be more effective in noisy, high-current environments like the Minas Passage.

Multipurpose X-Band Marine Radar Network for the Minas Passage

January – November 2019

Marine X-band radar locates vessels and features, including coastlines and buoys.  It filters distracting signals (eg.

Performance validation of a remotely operated vehicle (ROV) in a controlled environment

June 2018 – October 2019

In the past few years, the Nova Scotia tidal community has augmented its marine operational capacity, but some unknowns and risks still exist and the cost associated with such operations are high.

Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments

October 2017 – October 2019

Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.

Testing of a New Turbine Blade Design and Blade Materials

July 2018 – May 2019

There’s not yet a standardized, optimal way of extracting power from tidal currents. That’s why many tidal industry technologies are currently being tested around the world.

Integrated Active and Passive Acoustic System for Environmental Monitoring (ISEM)

August 2015 – May 2019

The project team will develop a novel environmental monitoring system that integrates data analysis software and active and passive acoustic sensors to provide real-time tracking of fish and marine mammals in high energy sites.