Research Portal
Displaying 1 – 10 of 21 results
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
The Pathway Program: Validating reliable environmental monitoring for ocean energy projects
April 2019 – October 2021
OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Environmental Monitoring System Development
November 2019 – April 2021
The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device
Acceleration/Particle Velocity (PA/PV) Measurement System Evaluation in a Tidal Environment
February 2017 – December 2018
The objective of this project was designing and running a field experiment to test the performance of the Particle Acceleration/Particle Velocity (PA/PV) vector sensor.
Analysis of Tidal Turbine Mooring Systems in Turbulent Flows Applying the (Wind Industry) FAST Simulation Tool and DSA ProteusDS Software
March – September 2018
For floating tidal turbine platforms, the turbine forces and resulting platform motions have a direct impact on the lifetime of its moorings and cables. This means the tidal sector must predict accurate tidal turbine loading on floating platforms to determine mooring life and cable longevity.
Assessing Corrosion, Wear, Fatigue and VIV on Moorings and Cabling to Reduce Risk in Marine Operations
October 2017 – August 2018
The cost of cabling and moorings over the entire life of a tidal energy project is a significant proportion of total project expenditures and the potential failure of these components remains a major risk for the emerging tidal energy sector.
Tidal Energy: Strategic Environmental Assessment – Bay of Fundy (Phase I)
April 2018
This Strategic Environmental Assessment (SEA) provides advice on whether, when and under what conditions tidal energy demonstration and commercial projects should be allowed in the Bay of Fundy.
In Situ Turbulence Replication and Measurement (InSTREAM)
October 2015 – January 2018
The In Situ Turbulence Replication and Measurement (InSTREAM) project was conceived to address some fundamental questions about the turbulence physics in tidal energy sites and laboratory tanks used to simulate these sites.
Development of High Performance Tidal Turbine Rotors
January 2013 – October 2015
This research investigated and informed novel and cost-effective engineering solutions to extract and deliver energy from tidal flows.