Research Portal
Displaying 11 – 20 of 22 results
Geoscience » Source Rock & Depositional Environment
Source Rock and Geochemistry of the Central Atlantic Margins
September 2014 – August 2017
This project evaluates known, probable and possible source rocks in the Nova Scotia shelf and deep water offshore areas with an emphasis On the Triassic– Jurassic time interval.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Sydney Basin Play Fairway Analysis Atlas (2017)
July 2017
The objectives of this Play Fairway Analysis are to build a detailed and comprehensive understanding of the petroleum systems of the Sydney Basin and provide a resource evaluation based on the petroleum systems assessment. The study concludes there is an effective petroleum system charged by mai
Geoscience » Source Rock & Depositional Environment
Sydney Basin and Nova Scotia Forensic Geochemistry
May 2016 – March 2017
Sydney Basin and Nova Scotia Forensic Geochemistry
Geoscience » Play Fairway Analyses Atlases 2010–Present
Laurentian Sub-Basin Atlas (2014)
January – December 2014
This project assesses the petroleum system of the Laurentian sub-basin bidding block and surrounding areas.
Testing of Temporal Monitoring Techniques for Benthic Habitat Impacts of Tidal Energy Developments
September 2011 – November 2014
This project tested and developed monitoring procedures for assessing the impact of the placement of in-stream tidal devices (e.g. turbines, cables and other seafloor hardware) on the seafloor environment.
Implications of Tidal Energy Extraction on Sedimentary Processes within Shallow Intertidal Environments
September 2011 – April 2014
This project assessed the implications of tidal energy extraction on sedimentary processes within shallow inter-tidal ecosystems.
Tidal Energy: Strategic Environmental Assessment – Bay of Fundy Update (Phase II)
January 2014
This is an update to the Phase 1 Strategic Environmental Assessment (SEA) of marine renewable energy in the Bay of Fundy, with an emphasis on tidal in‐stream turbines.
Marine Renewable Energy: Background Report To Support a Strategic Environmental Assessment (SEA) for the Cape Breton Coastal Region, inclusive of the Bras D’Or Lakes
June – December 2012
In 2011 following a competitive request for proposal process, OERA commissioned AECOM’s Halifax office to undertake a Strategic Environmental Assessment (SEA) for marine renewable energy in Cape Breton.
Impacts of Tidal Energy Extraction on Sediment Dynamics in Minas Basin, Bay of Fundy
February 2010 – December 2012
Researchers developed a numerical hydrodynamic and sediment transport model for Minas Basin in the Bay of Fundy, focusing on the sediment dynamics of the tidal inlets and flats.
Cape Breton Tidal Energy Resource Assessment
November 2011 – October 2012
In support of the Strategic Environmental Assessment (SEA) for the Cape Breton Region, inclusive of the Bras d’Or Lakes, Acoustic Doppler Current Profiler (ADCP) units were deployed at Barra Strait, Seal Island Bridge and Carey Point to collect tidal flow information. Potential sites for tidal e