Geoscience » Source Rock & Depositional Environment
Identifying and Constraining favourable paleoenvironments for the deposition of an Upper Jr SR using geochemical proxies (part of the PAGEO research program)
January 2021 – June 2023
This work will determine the paleoenvironmental conditions under which potential Upper Jurassic source rock intervals were deposited in offshore Nova Scotia.
Geoscience » Source Rock & Depositional Environment
Application of a source-to-sink sediment model to a petroleum systems analysis from field studies and numerical modeling (part of the PAGEO research program)
January 2021 – March 2023
This project will test the application of a source to sink analysis to the prediction of petroleum system elements in the Scotia Basin.
Geoscience » Georges Bank Research & Data
Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021
June – December 2021
Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
Development of High Performance Tidal Turbine Rotors
January 2013 – October 2015
This research investigated and informed novel and cost-effective engineering solutions to extract and deliver energy from tidal flows.
Turbulence and Bottom Stress in Minas Passage and Grand Passage
September 2011 – February 2015
This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.
Assessing Marine Mammal Presence in and near the FORCE Crown Lease Area during Winter and Early Spring
October 2013 – February 2015
This study closes the winter/spring baseline data gap via deployments of multiple, calibrated C-PODs and an icListenHF hydrophone, for the deepest sites at the FORCE Lease Area.
Testing of Temporal Monitoring Techniques for Benthic Habitat Impacts of Tidal Energy Developments
September 2011 – November 2014
This project tested and developed monitoring procedures for assessing the impact of the placement of in-stream tidal devices (e.g. turbines, cables and other seafloor hardware) on the seafloor environment.
Implications of Tidal Energy Extraction on Sedimentary Processes within Shallow Intertidal Environments
September 2011 – April 2014
This project assessed the implications of tidal energy extraction on sedimentary processes within shallow inter-tidal ecosystems.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.