Research Portal

Displaying 11 – 15 of 15 results

Filters

Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage

October 2011 – January 2013

This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.

Geoscience » Play Fairway Analyses Atlases 2010–Present

Play Fairway Analysis Atlas

January 2011

The original Play Fairway Analysis completed in 2011 identified rich hydrocarbon potential offshore Nova Scotia, with unrisked 120TCF of gas and 8Bbbls of oil in place. This potential has diverse characteristics and scales, which are described in detail in the Atlas.

Geoscience » Source Rock & Depositional Environment

Reservoir Distribution & Characterization: Shelf to Slope Linked Depositional Systems

August 2007 – August 2010

The objectives of this study are 1) to understand the complexities of shelf-to-slope and slope sedimentation patterns, and 2) to understand the controls inherent in mixed siliciclastic and carbonate shelf-edge depositional systems.  New play concepts were developed that identified significant rew

Geoscience » Source Rock & Depositional Environment

River Sources & Sand Transfer to the Deepwater Lower Cretaceous Scotian Basin

August 2007 – August 2010

This project aims to define the distribution systems for sand and help industry explorers refine their exploration targets and better understand the quality of underground petroleum reservoirs.

Geoscience » Source Rock & Depositional Environment

Analysis of Petroleum Systems on the Scotia Shelf using Thermal & Seismic Techniques

August 2007 – July 2010

The objective of this project is to produce new petroleum systems and high resolution seismic velocity models along several transects across the central and NE sectors of the Scotian Slope. Ground-truth from existing wells on the upper slope will be used as benchmarks.