Research Portal
Displaying 1 – 2 of 2 results
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
Geoscience » Source Rock & Depositional Environment
Development of Marginal Fields in Offshore Nova Scotia – Phase 1 & 2
June 2009 – June 2010
The reduction in cost of a marginal development is largely attributed to the potential reduction in size of the offshore installation. These types of installations are referred to as ‘minimal platforms’.