Research Portal
Displaying 1 – 9 of 9 results
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments
October 2017 – October 2019
Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.
Acceleration/Particle Velocity (PA/PV) Measurement System Evaluation in a Tidal Environment
February 2017 – December 2018
The objective of this project was designing and running a field experiment to test the performance of the Particle Acceleration/Particle Velocity (PA/PV) vector sensor.
Assessing Corrosion, Wear, Fatigue and VIV on Moorings and Cabling to Reduce Risk in Marine Operations
October 2017 – August 2018
The cost of cabling and moorings over the entire life of a tidal energy project is a significant proportion of total project expenditures and the potential failure of these components remains a major risk for the emerging tidal energy sector.
FORCE Site Marine Operations – Lessons Learned
November 2017 – April 2018
In recent years, marine operators have completed dozens of operations in the Minas Passage, from research surveys to instrument deployment, to the installation of electrical infrastructure to turbine deployment.
Nova Scotia Small Tidal Test Centre: Gap Analysis and Business Case
November 2017 – March 2018
As the tidal energy industry develops, there is increasing interest in the prospects for small-scale tidal energy development. Building small-scale tidal energy installations has promise given the number of locations where they can be used.