Research Portal

Displaying 1 – 10 of 16 results

Filters

Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

Field Assessment of Multi-beam Imaging Sonar Performance in Surface & Bottom Mount Deployments

March – December 2020

The Pathway Program - Technology Validation: Multibeam (Imaging) Sonars

Improved Analysis of Harbour Porpoise Sounds

May – December 2020

The Pathway Program - Data Automation: Passive Acoustic Monitoring Devices

Valuation Method for Electric Ancillary Services

May – September 2020

The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).

Development of High Performance Tidal Turbine Rotors

January 2013 – October 2015

This research investigated and informed novel and cost-effective engineering solutions to extract and deliver energy from tidal flows.

Assessing Marine Mammal Presence in and near the FORCE Crown Lease Area during Winter and Early Spring

October 2013 – February 2015

This study closes the winter/spring baseline data gap via deployments of multiple, calibrated C-PODs and an icListenHF hydrophone, for the deepest sites at the FORCE Lease Area.

Turbulence and Bottom Stress in Minas Passage and Grand Passage

September 2011 – February 2015

This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.

Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power

August 2013

Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.

Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage

June 2011 – July 2013

This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.