Research Portal

Displaying 1 – 10 of 13 results

Filters

Geoscience » Georges Bank Research & Data

Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021

June – December 2021

Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.

Geoscience » Source Rock & Depositional Environment

Tracking Mesozoic Paleoclimate Events on the Nova Scotia Margin: Integrating Biostratigraphic Legacy Data with New Stable Carbon Isotope Analyses (part of the PAGEO research program)

November 2020 – November 2021

This study will obtain empirical evidence for climatic perturbations and regional changes in oceanic circulation patterns by (1) acquiring an extensive dataset of stable isotope measurements from key wells located in the area of interest, (2) integrating these measurements with existing quantitat

Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

Geoscience » Source Rock & Depositional Environment

Analysis of Palaeoenvironment, Palaeoclimate and Palaeooceanographic Models to Predict Distribution of Source Rocks Offshore Nova Scotia (part of the PAGEO research program)

November 2020 – June 2021

The objective of this work is to predict the distribution of Tithonian and early Jurassic (Toarcian, Pliensbachian, Sinemurian, Hettangian) source rocks based on biogeographic principles derived from modern environments, and palaeoenvironmental interpretations derived from palaeogeographic mappin

Review of Nova Scotia Power Transmission System Interconnection Requirements

April – May 2021

Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo

In Situ Turbulence Replication and Measurement (InSTREAM)

October 2015 – January 2018

The In Situ Turbulence Replication and Measurement (InSTREAM) project was conceived to address some fundamental questions about the turbulence physics in tidal energy sites and laboratory tanks used to simulate these sites.

Testing of Temporal Monitoring Techniques for Benthic Habitat Impacts of Tidal Energy Developments

September 2011 – November 2014

This project tested and developed monitoring procedures for assessing the impact of the placement of in-stream tidal devices (e.g. turbines, cables and other seafloor hardware) on the seafloor environment.

Implications of Tidal Energy Extraction on Sedimentary Processes within Shallow Intertidal Environments

September 2011 – April 2014

This project assessed the implications of tidal energy extraction on sedimentary processes within shallow inter-tidal ecosystems.

Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage

June 2011 – July 2013

This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.