Research Portal

Displaying 1 – 8 of 8 results

Filters

Geoscience » Play Fairway Analyses Atlases 2010–Present

Shelburne Sub-Basin Play Fairway Analysis Update

November 2018 – June 2019

Shortly after the Scotian Shelf and Slope Play Fairway Analysis (PFA) was released in 2011, Shell Canada acquired six exploration parcels in the Shelburne Subbasin and collected approximately 10,850 square kilometers of wide azimuth 3D seismic data.

Tidal Energy: Strategic Environmental Assessment – Bay of Fundy (Phase I)

April 2018

This Strategic Environmental Assessment (SEA) provides advice on whether, when and under what conditions tidal energy demonstration and commercial projects should be allowed in the Bay of Fundy.

Nova Scotia Small Tidal Test Centre: Gap Analysis and Business Case

November 2017 – March 2018

As the tidal energy industry develops, there is increasing interest in the prospects for small-scale tidal energy development. Building small-scale tidal energy installations has promise given the number of locations where they can be used.

Geoscience » Play Fairway Analyses Atlases 2010–Present

Sydney Basin Play Fairway Analysis Atlas (2017)

July 2017

The objectives of this Play Fairway Analysis are to build a detailed and comprehensive understanding of the petroleum systems of the Sydney Basin and provide a resource evaluation based on the petroleum systems assessment.  The study concludes there is an effective petroleum system charged by mai

Community and Business Toolkit for Tidal Energy Development

November 2011 – March 2013

This toolkit covers the science, technology, business and community aspects of tidal energy development in Nova Scotia, effectively integrating the applied, natural and social sciences. It can serve as a model for future applied interdisciplinary work on tidal energy and marine renewables.

Cape Breton Tidal Energy Resource Assessment

November 2011 – October 2012

In support of the Strategic Environmental Assessment (SEA) for the Cape Breton Region, inclusive of the Bras d’Or Lakes, Acoustic Doppler Current Profiler (ADCP) units were deployed at Barra Strait, Seal Island Bridge and Carey Point to collect tidal flow information.  Potential sites for tidal e

Scoping Study on Socio-Economic Impacts of Tidal Energy Development in Nova Scotia: A Research Synthesis & Priorities for Future Action

November 2011 – January 2012

This scoping study highlights many socio-economic issues related to in-stream tidal energy development and discusses best practices, case studies and tools developed to facilitate positive socio-economic benefits and community development.

Geoscience » Play Fairway Analyses Atlases 2010–Present

Play Fairway Analysis Atlas

January 2011

The original Play Fairway Analysis completed in 2011 identified rich hydrocarbon potential offshore Nova Scotia, with unrisked 120TCF of gas and 8Bbbls of oil in place. This potential has diverse characteristics and scales, which are described in detail in the Atlas.