Research Portal
Displaying 1 – 10 of 11 results
The Pathway Program: Validating reliable environmental monitoring for ocean energy projects
April 2019 – October 2021
OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i
Environmental Monitoring System Development
November 2019 – April 2021
The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device
Developing Enhanced Marine Operations (DEMO) in High Flow Tidal Environments
October 2017 – October 2019
Conventional subsea remotely operated vehicles (ROVs) perform poorly in currents exceeding 1.5 m/s. This is a key operating limitation in the success and cost of marine operations in the Bay of Fundy, where current speeds reach 5 m/s.
Geoscience » Tectonics and Crustal Structure
Advanced Analyses of the MIRROR-1 OBS Profile from Offshore Morocco
July 2017 – April 2019
This project completes an analysis of the OETR and OCTOPUS seismic lines collected from offshore Nova Scotia and integrates the MIRROR I refraction line from offshore Morocco to allow comparison of the conjugate margins using wide-angle refraction/reflection ocean bottom seismometer profiles.
Geoscience » Georges Bank Research & Data
Georges Bank Research & Data
January 2019
Georges Bank is a large submarine bank (250km by 150km – 40,000 km2) located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia.
Acceleration/Particle Velocity (PA/PV) Measurement System Evaluation in a Tidal Environment
February 2017 – December 2018
The objective of this project was designing and running a field experiment to test the performance of the Particle Acceleration/Particle Velocity (PA/PV) vector sensor.
Assessing Corrosion, Wear, Fatigue and VIV on Moorings and Cabling to Reduce Risk in Marine Operations
October 2017 – August 2018
The cost of cabling and moorings over the entire life of a tidal energy project is a significant proportion of total project expenditures and the potential failure of these components remains a major risk for the emerging tidal energy sector.
FORCE Site Marine Operations – Lessons Learned
November 2017 – April 2018
In recent years, marine operators have completed dozens of operations in the Minas Passage, from research surveys to instrument deployment, to the installation of electrical infrastructure to turbine deployment.
In Situ Turbulence Replication and Measurement (InSTREAM)
October 2015 – January 2018
The In Situ Turbulence Replication and Measurement (InSTREAM) project was conceived to address some fundamental questions about the turbulence physics in tidal energy sites and laboratory tanks used to simulate these sites.
Cape Breton Tidal Energy Resource Assessment
November 2011 – October 2012
In support of the Strategic Environmental Assessment (SEA) for the Cape Breton Region, inclusive of the Bras d’Or Lakes, Acoustic Doppler Current Profiler (ADCP) units were deployed at Barra Strait, Seal Island Bridge and Carey Point to collect tidal flow information. Potential sites for tidal e