Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Review of Nova Scotia Power Transmission System Interconnection Requirements
April – May 2021
Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo
In Situ Turbulence Replication and Measurement (InSTREAM)
October 2015 – January 2018
The In Situ Turbulence Replication and Measurement (InSTREAM) project was conceived to address some fundamental questions about the turbulence physics in tidal energy sites and laboratory tanks used to simulate these sites.
Going with the Flow: Advancement of Drifting Platforms for use in Tidal Energy Site Assessment & Environmental Monitoring
April 2015 – August 2017
This research project aimed to apply a simple and low cost philosophy to ocean observation by developing an inexpensive low-profile surface drifter for use in initial assessment of potential tidal energy development opportunities. The project addressed limitations in the existing drifter design
Geoscience » Seismic & Marine Sound
Test Snow Crab Response to Seismic Stress
February 2012 – September 2013
There is concern in Atlantic Canada that there is insufficient information on the potential effects of seismic noise on snow crab.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Acoustic Tracking of Fish Movements in the Minas Passage and FORCE Crown Lease Area: Pre-Turbine Baseline Studies
June 2011 – July 2013
This project used animal tracking technology developed by VEMCO, a division of AMIRIX Systems of Halifax, NS. The technology allows researchers to track animal movements and behaviour over a scale of kilometers.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.
Community Engagement Strategies & Resource Guide To Support Small-Scale Tidal Power in Nova Scotia
March – July 2013
Community engagement strategies and a resource guide for stakeholders involved in marine renewable energy will support the success of marine renewable energy development in Nova Scotia.