Research Portal
Displaying 1 – 10 of 10 results
Real-Time Detection of Marine Mammals in High Flow Environments
May 2019 – September 2021
The project research goal is to design and test an innovative acoustic sensor system that will feature a wireless magneto-inductive (MI) communications link – to alert users in real time of the presence and location of marine mammals in high noise tidal environments. The research entails a field
The Pathway Program: Validating reliable environmental monitoring for ocean energy projects
April 2019 – October 2021
OERA created The Pathway Program to solve a critical problem impeding the in-stream tidal energy industry: a lack of reliable and validated technologies and methods to monitor and report fish-turbine interactions in high-flow, highly turbulent environments, leading to regulatory uncertainty and i
Environmental Monitoring System Development
November 2019 – April 2021
The Pathway Program - Technology Validation: Echosouders & Passive Acoustic Monitoring Device
Geoscience » Source Rock & Depositional Environment
Seismic Reconstruction and Petroleum Systems Modeling of the Nova Scotia-Morocco Conjugate Margin
April – December 2019
Seismic Reconstruction
The Seismic Reconstruction project is a stand-alone element of the Conjugate Margin Program undertaken by the consulting firm Beicip Franlab. A number of subprojects and data streams are inputs to this project.
Multipurpose X-Band Marine Radar Network for the Minas Passage
January – November 2019
Marine X-band radar locates vessels and features, including coastlines and buoys. It filters distracting signals (eg.
Integrated Active and Passive Acoustic System for Environmental Monitoring (ISEM)
August 2015 – May 2019
The project team will develop a novel environmental monitoring system that integrates data analysis software and active and passive acoustic sensors to provide real-time tracking of fish and marine mammals in high energy sites.
Geoscience » Georges Bank Research & Data
Georges Bank Research & Data
January 2019
Georges Bank is a large submarine bank (250km by 150km – 40,000 km2) located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia.
Development of High Performance Tidal Turbine Rotors
January 2013 – October 2015
This research investigated and informed novel and cost-effective engineering solutions to extract and deliver energy from tidal flows.
Assessing Marine Mammal Presence in and near the FORCE Crown Lease Area during Winter and Early Spring
October 2013 – February 2015
This study closes the winter/spring baseline data gap via deployments of multiple, calibrated C-PODs and an icListenHF hydrophone, for the deepest sites at the FORCE Lease Area.
Geoscience » Play Fairway Analyses Atlases 2010–Present
SW Nova Scotia Expansion Atlas (2015)
January 2015
This project is an expansion of the 2011 Play Fairway Analysis to the western border of the Nova Scotia marine shelf. This expansion corresponds to the Georges Bank zone and surrounding area extending from the Yarmouth Arch to the Shelburne Sub-basin.