Research Portal
Displaying 1 – 8 of 8 results
Geoscience » Tectonics and Crustal Structure
Paleogeographic Reconstruction and Source Rock De-Risking, Offshore Nova Scotia
February – November 2020
In this project GeoArctic modeled the tectonic evolution of the northern Central Atlantic to re-evaluate the syn-rift and early post-rift geological context of sedimentary basin formation.
Valuation Method for Electric Ancillary Services
May – September 2020
The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).
Analysis Framework for Long-Term and Cumulative Effects Monitoring
October 2018 – September 2020
This project created a framework for testing in-stream tidal turbine effects on specific marine species populations. The framework provides the basis for future assessment of far-field and cumulative environmental effects.
Modeling of Electric Boats as Energy Storage
July 2018 – September 2020
Electric boats have the potential to act as “energy storage wrapped in a boat”.
Feasibility Study: Tidal Sector Service Barge/Drydock
April – November 2018
The study investigates the feasibility of developing a generic, shared-use, multi-function turbine transport deployment and retrieval barge/drydock for use by the Nova Scotia tidal energy sector.
Using Radar to Evaluate Seabird Abundance and Habitat Use at the Fundy Ocean Research Center for Energy Site near Parrsboro, Nova Scotia
April – September 2018
Shore-based seabird surveys conducted at the Fundy Ocean Research Center for Energy (FORCE) in Parrsboro, NS, determine abundance, habitat use and potential risk to seabirds at the site.
Using Dry Ports to Support Nova Scotia’s Tidal Industry
March – June 2018
This study investigates two Nova Scotia “dry ports” and their potential in supporting the Bay of Fundy region’s emergent tidal energy industry. The term ‘dry port’ refers to a port where the harbour bottom is mainly exposed at low tide.
Tidal Energy: Strategic Environmental Assessment – Bay of Fundy (Phase I)
April 2018
This Strategic Environmental Assessment (SEA) provides advice on whether, when and under what conditions tidal energy demonstration and commercial projects should be allowed in the Bay of Fundy.