Research Portal
Displaying 1 – 8 of 8 results
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Field Assessment of Multi-beam Imaging Sonar Performance in Surface & Bottom Mount Deployments
March – December 2020
The Pathway Program - Technology Validation: Multibeam (Imaging) Sonars
Improved Analysis of Harbour Porpoise Sounds
May – December 2020
The Pathway Program - Data Automation: Passive Acoustic Monitoring Devices
Geoscience » Tectonics and Crustal Structure
Paleogeographic Reconstruction and Source Rock De-Risking, Offshore Nova Scotia
February – November 2020
In this project GeoArctic modeled the tectonic evolution of the northern Central Atlantic to re-evaluate the syn-rift and early post-rift geological context of sedimentary basin formation.
Assessment of Geothermal Resources in Onshore Nova Scotia
May – November 2020
The objective of this project is to: (i) provide a review of the general types of geothermal resources in Nova Scotia (excluding shallow resources utilized by ground-source heat pumps) with reference to key regional, national and global examples; (ii) provide a preliminary evaluation of the poten
Advancing Tidal Energy Turbine Operations through High Fidelity Tug Propulsion and Control Simulation Software
November 2016 – March 2017
The project objective was to develop a numerical model of a tug boat and its propulsion system to accurately predict its dynamic behaviour in turbulent tidal flows.
Geoscience » Play Fairway Analyses Atlases 2010–Present
Central Scotian Slope Atlas (2016)
January – August 2016
The objective of this project was to identify and technically evaluate any significant exploration leads and prospects in the area of interest. The study used integrated 3D basin modelling analysis to assess the timing of maturation of source rocks, transformation ratios, hydrocarbon entrapment,