Research Portal

Displaying 1 – 10 of 13 results

Filters

Value Proposition for Tidal Energy Development in Nova Scotia, Atlantic Canada and Canada

January 2014 – April 2015

This study shows there is substantial potential economic opportunity in building a tidal energy industry in Canada. It indicates that tidal energy could reduce our dependence on fossil fuels and create a new industry offering significant socio-economic benefits.

Turbulent Scale and Wake Modeling on a Horizontal Axis Turbine

January – April 2015

This project aimed to accurately simulate turbulent flow over a scaled horizontal axis tidal turbine to resolve turbulence in the near and far field regions.

Assessing Marine Mammal Presence in and near the FORCE Crown Lease Area during Winter and Early Spring

October 2013 – February 2015

This study closes the winter/spring baseline data gap via deployments of multiple, calibrated C-PODs and an icListenHF hydrophone, for the deepest sites at the FORCE Lease Area.

Turbulence and Bottom Stress in Minas Passage and Grand Passage

September 2011 – February 2015

This project aimed to investigate turbulence and bottom stress at two sites being targeted for in-stream tidal power development in Nova Scotia: Minas Passage in the Upper Bay of Fundy and Grand Passage, located between Brier and Long Island in the lower Bay of Fundy.

Geoscience » Play Fairway Analyses Atlases 2010–Present

SW Nova Scotia Expansion Atlas (2015)

January 2015

This project is an expansion of the 2011 Play Fairway Analysis to the western border of the Nova Scotia marine shelf. This expansion corresponds to the Georges Bank zone and surrounding area extending from the Yarmouth Arch to the Shelburne Sub-basin.

Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power

August 2013

Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.

Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage

June 2011 – July 2013

This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.

Acoustic Tracking of Fish Movements in the Minas Passage and FORCE Crown Lease Area: Pre-Turbine Baseline Studies

June 2011 – July 2013

This project used animal tracking technology developed by VEMCO, a division of AMIRIX Systems of Halifax, NS. The technology allows researchers to track animal movements and behaviour over a scale of kilometers.

Cross Coupling between Device Level CFD and Oceanographic Models Applied to Multiple TISECs in Minas Passage

October 2011 – January 2013

This project aimed to develop a link between oceanographic computer models and Computational Fluid Dynamics (CFD) models in order to improve state-of-the-art modelling techniques used for resource assessments and tidal turbine siting for both single and multiple in-stream tidal energy devices.

Tidal Energy Resource Assessment Map for Nova Scotia

March – October 2012

This project used numerical simulations and theoretical calculations to predict not only the power that can be extracted from the flow through a passage but also the reduction in flow through the passage.