Research Portal
Displaying 1 – 10 of 18 results
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Field Assessment of Multi-beam Imaging Sonar Performance in Surface & Bottom Mount Deployments
March – December 2020
The Pathway Program - Technology Validation: Multibeam (Imaging) Sonars
Improved Analysis of Harbour Porpoise Sounds
May – December 2020
The Pathway Program - Data Automation: Passive Acoustic Monitoring Devices
Net-Zero Future: A Feasibility Study of Hydrogen Production, Storage, Distribution and Use in The Maritimes
July – October 2020
This study explores hydrogen’s potential contribution to the Maritimes’ sustainable development goals. It also provides a technical and economic assessment of the role that hydrogen could play in the Maritimes’ energy transition.
Valuation Method for Electric Ancillary Services
May – September 2020
The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).
Development of High Performance Tidal Turbine Rotors
January 2013 – October 2015
This research investigated and informed novel and cost-effective engineering solutions to extract and deliver energy from tidal flows.
Assessing Marine Mammal Presence in and near the FORCE Crown Lease Area during Winter and Early Spring
October 2013 – February 2015
This study closes the winter/spring baseline data gap via deployments of multiple, calibrated C-PODs and an icListenHF hydrophone, for the deepest sites at the FORCE Lease Area.
Seasonal Erodibility of Sediment in the Upper Bay of Fundy
February 2012 – January 2015
This project developed methods for studying sedimentation to the macro-tidal flats of the upper Bay of Fundy. The researchers looked at seasonal variation in the erodibility of sediments in tidal creeks and flats using a Gust Erosion Chamber and repeated grain size surveys.
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.