Research Portal

Displaying 1 – 10 of 25 results

Filters

Geoscience » Georges Bank Research & Data

Science and Socio-economic Review of the Georges Bank Prohibition Area 2020-2021

June – December 2021

Georges Bank is a large submarine platform located at the edge of the Atlantic continental shelf between Cape Cod and Nova Scotia. The Georges Bank Prohibition Area covers a significant portion of Georges Bank and is located on the Canadian side of the Canada-United States maritime boundary.

Participation in the Pathway Program through Development of the Platform and Cabling Solution

February 2020 – September 2021

The Pathway Program - Cable & Platform Development / Sensor Integration

Review of Nova Scotia Power Transmission System Interconnection Requirements

April – May 2021

Power Advisory was engaged by OERA on behalf of the Nova Scotia Department of Energy & Mines to review the recently released Nova Scotia Power Transmission System Interconnection Requirements (TSIR) and identify any gaps between recommendations made by Power Advisory in their August 2020 repo

Net-Zero Future: A Feasibility Study of Hydrogen Production, Storage, Distribution and Use in The Maritimes - NL Extension

January – March 2021

This study investigated what role hydrogen can play in Newfoundland and Labrador’s future energy system.

Field Assessment of Multi-beam Imaging Sonar Performance in Surface & Bottom Mount Deployments

March – December 2020

The Pathway Program - Technology Validation: Multibeam (Imaging) Sonars

Improved Analysis of Harbour Porpoise Sounds

May – December 2020

The Pathway Program - Data Automation: Passive Acoustic Monitoring Devices

Net-Zero Future: A Feasibility Study of Hydrogen Production, Storage, Distribution and Use in The Maritimes

July – October 2020

This study explores hydrogen’s potential contribution to the Maritimes’ sustainable development goals. It also provides a technical and economic assessment of the role that hydrogen could play in the Maritimes’ energy transition.

Valuation Method for Electric Ancillary Services

May – September 2020

The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).

Integrated Active and Passive Acoustic System for Environmental Monitoring (ISEM)

August 2015 – May 2019

The project team will develop a novel environmental monitoring system that integrates data analysis software and active and passive acoustic sensors to provide real-time tracking of fish and marine mammals in high energy sites.