Research Portal
Displaying 1 – 10 of 15 results
Participation in the Pathway Program through Development of the Platform and Cabling Solution
February 2020 – September 2021
The Pathway Program - Cable & Platform Development / Sensor Integration
Automated post-processing, using machine-learning models; Automated analytical tools (that generate estimates of fish frequency, abundance, and distribution)
April 2020 – May 2021
The Pathway Program - Data Automation: Echosounders
Field Assessment of Multi-beam Imaging Sonar Performance in Surface & Bottom Mount Deployments
March – December 2020
The Pathway Program - Technology Validation: Multibeam (Imaging) Sonars
Improved Analysis of Harbour Porpoise Sounds
May – December 2020
The Pathway Program - Data Automation: Passive Acoustic Monitoring Devices
Valuation Method for Electric Ancillary Services
May – September 2020
The objective of this project is to define a new, enhanced power purchase agreement (PPA) for use by NSPI or an independent procurement administrator when contracting with Independent (e.g., renewable) Power Producers (IPPs).
Integrated Active and Passive Acoustic System for Environmental Monitoring (ISEM)
August 2015 – May 2019
The project team will develop a novel environmental monitoring system that integrates data analysis software and active and passive acoustic sensors to provide real-time tracking of fish and marine mammals in high energy sites.
In Situ Turbulence Replication and Measurement (InSTREAM)
October 2015 – January 2018
The In Situ Turbulence Replication and Measurement (InSTREAM) project was conceived to address some fundamental questions about the turbulence physics in tidal energy sites and laboratory tanks used to simulate these sites.
Going with the Flow: Advancement of Drifting Platforms for use in Tidal Energy Site Assessment & Environmental Monitoring
April 2015 – August 2017
This research project aimed to apply a simple and low cost philosophy to ocean observation by developing an inexpensive low-profile surface drifter for use in initial assessment of potential tidal energy development opportunities. The project addressed limitations in the existing drifter design
Turbulence and Drag in a High Reynolds Number Tidal Passage Targeted for In-Stream Tidal Power
August 2013
Results are presented from an investigation of turbulence and bottom drag carried out in Grand Passage, lower Bay of Fundy.
Passive Acoustic Monitoring of Cetacean Activity Patterns and Movements Pre- and Post-deployment of TISEC devices in Minas Passage
June 2011 – July 2013
This project aimed to conduct pre- and post- in-stream tidal energy device deployment assessments of marine mammal activity and to assess the potential risk for interaction with turbine infrastructure.